Media Library / Images

In order to send you the picture material you need, please click some examples – after receipt of your E-Mail we will personally contact you to hear your exact requirements.

Category

  • All
  • Products
  • Applications
  • Company

Applications

  • All
  • Petrol Station Equipment
  • AdBlue® Refilling
  • Tank Truck Equipment
  • Alternative Fuels
  • Chemicals
  • LPG / DME
  • Pharmaceuticals
  • CNG / NGV
  • Aircraft Refuelling Equipment
  • LNG
  • Rail Tankers
  • H2 Hydrogen
  • Ships & Marina
  • LH2 Hydrogen
  • Rubber Expansion Joints
  • Hose Reels

Sales Division

  • All
  • SAT
    (Hoses and Fittings)
  • EHT
    (Petrol Pump Nozzles and Accessories / Hoses)
  • ERV
    (Rubber Expansion Joints)

Sorting

  • Newest on top
  • Alphabetical

Filter by keyword

 

1729 images found

 


ELAFLEX Hamburg

ELAFLEX Hamburg

Hose assemblies, marking after testing on the fitting

DDC-M 25-1" SS

DDC-M 25-1" SS

MannTek Dry Disconnect Coupling, DN 25, stainless steel

FGN 3" SS

FGN 3" SS

Flange with male thread, stainless steel

Dantec Production hose

Dantec Production hose

Composite hoses: crimping of a flanged hose coupling

Assembling Spannloc hose fittings

Assembling Spannloc hose fittings

ERV-G

ERV-G

Pump station for fuels

AN 2 Al

AN 2 Al

Welding nipple aluminium

V 19-3/4" NPT

V 19-3/4" NPT

Male ferrule hose coupling EN 14424 stainless steel, reusable. Slimline 19 SF (sulphur free) hose, black.

DCC Dry Cryogenic Coupling for LNG

DCC Dry Cryogenic Coupling for LNG

Coupling process

Construction site / on site refuelling:

Construction site / on site refuelling:

ZVA 25 (automatic nozzle), road tanker

Construction of ELAFLEX composite hoses type FWS

Construction of ELAFLEX composite hoses type FWS

Sectioned view of a composite hose, denomination of the components – detail view

Ship bunkering

Ship bunkering

Taking probes; VK coupling

HD-C aircraft refuelling hose

HD-C aircraft refuelling hose

HD 50 C F

Coloured hose assemblies for the forecourt

Coloured hose assemblies for the forecourt

Slimline 21, M 21-1" NR

Universal hose assembly

Universal hose assembly

PCS 75 (Polypal Clean DN 75 mm) with MX 75-3" SS and DDC-M 80-3" SS Dry Disconnect Coupling

ERV-W 80.16 ZS 2

ERV-W 80.16 ZS 2

White Band Rubber Expansion Joint with "ZS" limiter (tie rods with outer limitation in rubber bushings)

Oasis FV103 Fill Valve, NC 104 Nozzle Coupler, CNG bus refuelling

Oasis FV103 Fill Valve, NC 104 Nozzle Coupler, CNG bus refuelling

Slimline hose assembly, section view

Slimline hose assembly, section view

ERV-GR

ERV-GR

Grinding oil

Rubber Expansion Joint ERV-CR 80.16

Rubber Expansion Joint ERV-CR 80.16

CR Expansion Joints for cold and warm water, swimming pool water, sea water, waste water (weakly sour or alkaline) also oil containing, cooling water with protective oils against corrosion, lubricating oil, grease and air, compressed air. Temperature range (depending on medium) - 25° C up to + 90° C, temporarily up to + 100° C. Electrically non-conductive.

ELAPHARM hose assemblies, applications

ELAPHARM hose assemblies, applications

Ship bunkering

Ship bunkering

'Yellow Band' collapsible high 

Ship cargo loading with FWS-PP composite hoses

Ship cargo loading with FWS-PP composite hoses

DDC-V 50 SS F

DDC-V 50 SS F

MannTek Dry Disconnect Coupling, DN 50, stainless steel, with flange connection

ERV-OR

ERV-OR

"Orange Band" Rubber Expansion Joints, road tanker

ELAFLEX HIBY Tanktechnik, Production Plettenberg / Germany

ELAFLEX HIBY Tanktechnik, Production Plettenberg / Germany

Dispatch

AN 2 St

AN 2 St

Welding nipple steel

Road tanker hose assembly

Road tanker hose assembly

with VKC 75 SS (TW male coupling stainless steel, one part, with Spannloc clamps, K-Ring), dust cap VB 80 SS & chain

GasGuard GG11R

GasGuard GG11R

The GasGuard GG11 Back-Check Valve (GG11R: with additional release screw) should be standard equipment for any LPGas road tanker operator. It is used in conjunction with LPGas bulk refueling nozzles to contain leaks at storage tank fill points. If the fill point proves to be leaking when removing the nozzle it can be left on the tank until corrective action is taken. The driver can move to the next fill point without delay.

ERV-R

ERV-R

"Red Band" Rubber Expansion Joints with limiters / ship engine room



Order Form

Contact details